What this enables
Once the Connected Boards column is configured between two boards, you can:- Sync linked items — the items linked in the Connected Boards column are kept in sync between the boards
- Add Mirror columns — pull specific column values (such as Status, Date, or formula results) from the source board and display them on the target board
- Work around Formula column limitations — since SIMB doesn’t natively sync Formula columns, you can use a Mirror column to display formula results from another board without recreating the formula logic
Set up Connected Boards with SIMB
1
Add a Connected Boards column to both boards
Go to your first board and add a new column. Select Connected Boards as the column type and give it a name — for example, “Project Link”. Then open your second board and add a Connected Boards column with the exact same name (“Project Link”). The column names must match for SIMB to recognize them as linked.
2
Manually link the boards in each column's settings
On both boards, open the settings for the “Project Link” column and connect it to at least one board in common (connecting both to the same board or boards is simplest). Connected Boards syncs unless the two columns connect to completely different boards (no board in common); in that case that column is skipped.
3
(Optional) Add a Mirror column to pull data from the source board
If you want to display specific data from the connected board, add a Mirror column to your target board. Configure it to pull the value you need — for example, a “Date” column or a “Sales” formula result. The Mirror column reflects changes from the source board automatically.